Roof Installation & Replacement in Burnaby, BC
A new roof is a set of decisions that have to agree with one another. The roof's slope, geometry, substrate and drainage narrow which systems suit it in the first place; the system chosen then brings its own requirements — underlayment, protection at eaves and valleys, flashing, and the ventilation it has to work alongside. Neither end settles the other on its own. GoodVans Roofing handles roof replacement in Burnaby and installation on new work, and the useful question about any proposal is whether its parts suit each other and the roof they are going onto.
What tips a roof from repair into replacement
Not age. A roof does not become a replacement candidate on a birthday, and a sound roof with one clear fault is still a repair.
What tips it is the pattern. Faults appearing in unrelated areas within a similar stretch of time. Granule loss and curling on more than one slope. A run of repairs each individually right, none of which changed the roof's direction of travel. Further repair stays possible; it simply stops addressing what is happening.
Weighing another repair against a new roof
Neither call can be made from ground level, and neither rests on a single symptom. What follows describes what usually shifts the balance, not a test to score your own roof against.
Another repair stays reasonable while the fault has a boundary and its source has been found. The thing to satisfy yourself about is whether the proposed work addresses the cause or the spot where water appeared. Those are often different places, and a repair aimed at the second will not hold — one reason a stain comes back after someone has already attended to it.
Replacement comes into view on different evidence. Deterioration spread rather than localised. Repairs that stay individually correct while the roof keeps generating more. Water present long enough that the deck beneath becomes a question. Or a fault that cannot practically be handled alone, because reaching it means opening enough surrounding roof that doing part of it loses its point.
Where the picture resolves into neither, it has to be established first. Extent cannot be estimated from a description.
Installation is a different job from replacement. A roof going onto new construction or an addition has no covering to remove, no repair history and no concealed deck, so the work starts at the assembly rather than at a tear-off.
What has to be known before scope
A few things need establishing rather than assuming: whether the current faults share one cause, how many coverings are up there, how far the deterioration reaches, and whether drainage and ventilation are performing.
That last one carries more weight than it sounds. Where ventilation is inadequate, moisture and heat in the attic work on the assembly from beneath, so a replacement that puts the same arrangement back carries those conditions into the new roof.
What the covering choice commits you to
Roof area is the obvious number and the least informative one.
Geometry carries more of it: a steeper pitch needs fall protection and takes longer, while dormers, valleys, chimneys and skylights each introduce detail a plain gable never requires. The number of coverings already up there sets removal volume. Deck condition reaches materials and labour both, and part of it stays hidden until the old surface is off. Access decides staging — what goes up, and what comes down.
Material belongs here too, and not only as a cost. GoodVans Roofing installs asphalt shingle and metal, plus torch-on where a section is flat, and roofing systems and materials sets out the comparison on its own terms. What matters for scope is narrower: a covering arrives with installation requirements attached, and they reach past it into the detailing it needs and the ventilation it works alongside.
Venting depends on how the assembly is designed. Under Subsection 9.19.1 of the BC Building Code, roof spaces above insulated ceilings are generally vented to the exterior, unless venting can be shown unnecessary for that assembly. Where it applies, the minimum unobstructed vent area is 1/300 of the insulated ceiling area, or 1/150 below a 1-in-6 slope or where the roof is built with roof joists, with the openings distributed rather than merely present — at least a quarter high in the space and a quarter low. Which of that applies is a question for the design, not one the covering settles.
The layers nobody sees again
A replacement is not a fresh surface over the old arrangement. Once the covering is off, the deck comes into view after years out of sight, and what it shows decides part of the job.
Exposed, it can be assessed properly. Sections that prove damaged, or unsuitable for the system going on, may need attention before installation continues. Unsuitable is the word doing the work: a deck can be sound and still not suit a particular covering.
What sits between deck and covering is scope as well, and none of it can be seen once the roof is finished — the argument for asking what is specified at the outset rather than meeting it as a variation later.
Where the covering stops and the details take over
Every interruption in the covering is a place the material alone cannot manage water.
Valleys, roof-to-wall junctions and the flashing at penetrations carry water across those breaks. Vents, pipes and chimneys each open the surface and have to be sealed back into it. A skylight is its own question, and a replacement is the practical moment to look at one, since attending to it afterwards means reopening roofing that has just gone on. Where water travels once it leaves the covering is settled at the gutters and the roof edge.
None of this means every detail needs renewing. The point is narrower: a scope drawn only around the covering can pass over interfaces that also manage water, and those suit the covering rather than being inherited.
How the work runs
The work runs in four stages: the roof is inspected and discussed, the job is planned, the installation or replacement is carried out, and the finished work is walked before the crew leaves.
Around it sit items varying by property and contractor, which belong in the written scope rather than anyone's head: where material and the bin sit and for how long, the access required, protection for planting and siding beneath the work area, and how anything uncovered after removal gets priced and agreed. Tear-off is loud and the sound carries inside, worth planning around if somebody works from home.
Reading a proposal for what it leaves out
Read what each one covers. The figure at the bottom is the last thing to look at.
Two proposals for one roof can describe materially different work and land in the same range. Ask directly where they separate: what underlayment and eave protection are named; whether ventilation is corrected or left as found; what happens at an existing skylight; how the gutters and roof edge are treated; how much detail and flashing work is in; the basis for pricing sheathing if damage appears; and whether the covering comes off or an overlay is proposed. Disposal and access belong on the page too.
Where a proposal says nothing about one of these, that is a question rather than something to infer.
Common questions
We are changing from asphalt to metal. Does that change what goes on underneath?
It can. A covering brings its own installation requirements, and they reach beneath it — the underlayment specified, how eaves and valleys are protected, how the roof edge is formed, what fastening the deck has to accept. A sound deck can still be wrong for a new system. Ask what changes below the surface rather than assuming it stays the same.
Can the existing flashing stay when the covering is replaced?
Sometimes — but it ought to be decided rather than defaulted to. Flashing is formed around a particular covering and its profile, so metal that performed under one system is not automatically right under another. Condition counts too, and flashing is never more accessible than during a replacement. A proposal should say which details are renewed and which are kept.
The proposal does not mention ventilation. Should it?
Worth raising. A replacement either corrects the existing arrangement or leaves it as it stands, and leaving it carries any existing conditions forward. An omission does not tell you which is intended: it establishes nothing about whether the ventilation will be retained, assessed or altered. Where ventilation bears on the work proposed, ask for it in writing rather than inferring.
We are adding a room. Is the roof on an addition the same job as a replacement?
Not technically. New work has no covering to strip, no repair history and no hidden deck, so the questions are about designing the assembly rather than discovering one. Where an addition meets an existing roof, that junction becomes its own piece of work, and the new section's covering has to suit what it joins.
Which question are you actually asking?
If you cannot tell whether this is one more repair or the beginning of a replacement, settle that first — it is a different question from asking for a price. Get in touch and we can assess the roof's condition, or read what the residential installation and replacement service covers. For how this sits beside the other property types, roofing in Burnaby is the place to start.