facebook instagram Whatsapp
Certified Master Roofers in Metro Vancouver

No worries. Let's try it this way

Please fill your details, and we will provide you with an estimate in a very timely manner.

Burnaby, BC · Commercial Roofing

Roof Coatings & Waterproofing in Burnaby, BC

A flat commercial roof finished with a white coating, rooftop units and a city skyline behind

A coating goes onto a roof that is already there, which makes the first question one about the roof rather than the product. GoodVans Roofing applies roof coatings to existing commercial and industrial roofs in Burnaby. What an examination produces is less often a yes or a no than a list — the things that would have to be put right before a coating is sound work. On some roofs the list is short and the coating follows it. On others it keeps growing until it has become the project.

What the coating is being bought to do

A coating goes over the roofing already in place, covering the prepared surface and its details. GoodVans Roofing offers coating and waterproofing as one service. A protective roof coating adds weather resistance to a suitable existing surface, but it is not automatically a waterproofing membrane. A purpose-designed waterproofing system has different requirements for materials, continuity and detailing. Neither treatment guarantees that a roof will never leak.

What it can achieve is bounded by what it goes onto. Over roofing still doing its job, it adds protection. Over deterioration nobody has addressed, it adds a surface and leaves the rest where it was. None of which counts against coatings — it is why the roof gets examined first.

A coated flat roof with rooftop units in late-afternoon light

What the roof has to answer before a coating is specified

An inspection comes first, cracks and leaks included, and what GoodVans Roofing takes from it sets the approach — not the roof's age.

The questions are practical ones. What system is up there, and in what state. Whether the surface will accept a treatment and retain it. Whether damage is confined or general. Whether water is entering, and whether the assembly has already taken moisture on, which no surface treatment draws back out. How the roof drains. How the seams, outlets, curbs, edges and transitions are behaving, since those rarely match the open field.

Then there is the roof's history. Earlier repairs, patched areas and any previous coating all become part of the surface a new treatment has to bond to, and little of it is reliably documented.

None of these is a pass or a fail on its own. Each returns a quantity: how much work it would take to put that condition right. Added together, those quantities decide whether a coating is still the thing being discussed.

A roof drain set in a freshly coated flat roof

Preparation is where the real scope sits

Preparation is there so the surface beneath does not work against the coating in its first months, and what it involves follows from the particular roof rather than from a standard routine. Seams and joints take particular attention, since a continuous film has to cover joints that were never continuous.

This is the part of a coating project that varies. Application is relatively predictable once the surface is right; getting the surface right is where two roofs of the same area stop resembling each other. So the preparation scope, not the product, is where a coating proposal carries most of its meaning — and the part most easily left vague.

The three outcomes, and why the middle one matters most

An examination can land in three places.

The roof suits a coating as it stands. The roofing is serviceable and compatible, and the surface will hold a treatment.

Defined work comes first, and then the question is asked again. Damage in one place, a failed detail, or drainage that is not working may each have to be put right first.

Another scope is what the roof actually needs. Where deterioration is widespread, where moisture has entered the assembly, where the surface is not compatible, or where water is arriving from somewhere other than the roof surface, the decision has moved to commercial and industrial roofing in Burnaby rather than to a treatment.

The middle is the only one of the three with a size to it, and whether that size stays contained or keeps climbing is what tells an owner which of the three they are actually in.

Coating carried up the curb at the base of a rooftop mechanical unit

What roof coatings work involves in Burnaby

The work runs in a set order. The roof is inspected, with cracks and leaks analysed. Preparation then covers whatever that turned up. The protective system is applied, and a final quality check closes the job.

Before anything is agreed, the property is seen, a course of action recommended and an estimate given.

A roofer rolling a white coating onto a flat roof

What the preparation line has to say

Worth having in writing before coating work is agreed: what the examination found; which corrections are included and which are not; what area is being treated; how the seams, outlets, penetrations and edges are handled; and what follows if preparation turns up something the examination could not reach.

That last one carries more weight here than on most roofing work, because preparation is the stage that opens up the surface being treated.

Common questions

Repairs first, we are told. When does that stop being a coating project?

What the list is made of matters more than its length. Defined corrections at identified places, with sound roofing between them, still point at a coating. Once they cover much of the area, or reach into the assembly, the treatment has become the smaller half of the job.

Can part of a roof be coated and the rest left?

Sometimes, and it should be stated, not assumed. A treatment that stops partway leaves a boundary, which has to be detailed. What matters is that the proposal names the area included and what happens where treated and untreated roofing meet.

Preparation is shown as an allowance, not a scope. Is that a problem?

Worth questioning, since preparation decides how the coating performs. An allowance sets money aside without saying what will be done with it. Ask which of the examination's findings it is meant to cover, so the figure has a scope attached.

Can a roof reach a point where coating is no longer an option?

In practice yes. Suitability is something a roof can be brought to while the corrections stay contained. A roof left until deterioration is widespread, or until moisture has entered the assembly, has moved past the point a surface treatment can answer.

Starting with what would have to come first

Weighing a coating against repair or wider work starts with one question: what would have to happen first, and is that still a coating job? Have the roof assessed, or see what GoodVans Roofing's roof coatings and waterproofing covers. Where the system itself is the real subject, low-slope roofing in Burnaby and torch-on roofing in Burnaby cover that ground.

Let's talk

Contact Info

  • Address GoodVans Roofing 207 W Hastings St, Unit 1210, Vancouver, BC V6B 1H7, Canada
  • Contact Number 17783778209
  • Email ID info@gvroofs.ca
facebook instagram Whatsapp